C-61.1, r. 78 - Regulation respecting hunting and fishing controlled zones

Full text
25.3. A person authorized to camp in the territory of a ZEC must comply with the following conditions:
(1)  use camping equipment that is mobile, temporary and not attached to the ground; and
(2)  with the exception of campgrounds and storage sites set up by the agency, remove the person’s camping equipment from the territory of the ZEC from the later of the following dates, November 30 or 48 hours after the end of big game hunting in the territory of the ZEC, until 15 April.
O.C. 64-2012, s. 7.